Train orders, schedules and manifests for realistic operation.
Click on a link above to read more detail about it.
Assigning Engines
When you call trains for operation, the program lists available engines and allows you to select up to six of them for the train run.
The maximum length that the train may become for the run is determined by the capacities of all assigned engines. If you want a short train today, assign few and/or small engines. For longer trains assign more and/or bigger engines.